Caminito Del Rey
The 'new' Caminito del Rey was re-constructed and reopened to the public in 2015. The the route and design of the new path keeping as closely as possible to the old 1921 path. The famous boardwalk sections are constructed with wooden slatted transverse planks and a simple 1.2m-high three-wire guard rail. In places the path is only one metre wide, hanging to the cliff face. The 'old' path can be seen just below. A highlight is the steel suspension bridge with an open grid decking across the gorge, just next to the original emblematic aqueduct bridge.


